Neoga
System Information
System Description
Neoga leases Lake Mattoon water from the City of Mattoon. The Reliant Energy peaker plant also withdraws water from the lake. Neoga has one intake on the lake that can transport water directly to the treatment plant at 255 gpm. During droughts, Lake Mattoon water is allocated to Mattoon and Neoga based on population ratios.
Satellite Communities and Water Districts
None
Population Served: |
1854 |
County: |
Cumberland |
Watersheds: |
Little Wabash |
Water Source
Name |
Type |
Stream |
DA (sq mi) |
SA (ac) |
Capacity |
Year Est. |
Est. 2010 Cap. (ac-ft) |
Lake Mattoon |
IR |
Little Wabash R |
56 |
1027 |
11812 |
2001 |
11503.7 |
1989 Study: |
50-year drought yield sufficient at present level of water use. |
USGS Gages: |
No data available |
Developments since 1989:
The Reliant Energy peaker plant began withdrawing water from Lake Mattoon in 2001.
Notes and Terminology
Vulnerability Report
Choose another Community